
Engineering drawings.
From creation
to sourcing.
Read structural and MEP drawings.
Extract quantities. Compare vendor offers.

Read drawings.
See the connections.
Read equipment, dimensions and notes
across plans, sections and schedules.
Compare technical
offers.
Prepare a bill of quantities from your drawings.
Check vendor offers against your specifications.
M-201Ventilation · Level 02
Air handling unit AHU-02
| Requirement | Specified | Offer A | Offer B | Offer C |
|---|---|---|---|---|
| Performance | ||||
| Supply airflow | 12,000 m³/h§ 2.1 | 12,000 m³/hp. 4 | 11,000 m³/hp. 4 | 12,000 m³/hp. 3 |
| External pressure | 750 Pa§ 2.1 | 750 Pap. 4 | 750 Pap. 4 | 750 Pap. 3 |
| Cooling capacity | ≥ 85 kW§ 2.2 | 87 kWp. 5 | 85 kWp. 5 | 89 kWp. 4 |
| Construction & filtration | ||||
| Filter efficiency | ePM1 60%§ 2.3 | ePM1 60%p. 6 | Not stated— | ePM1 60%p. 5 |
| Casing leakage | Class L2§ 2.4 | Class L2p. 6 | Class L2p. 6 | Class L2p. 5 |
| Panel thickness | 50 mm§ 2.4 | 50 mmp. 6 | 50 mmp. 6 | 50 mmp. 5 |
| Electrical & documentation | ||||
| Power supply | 415 V · 3 phase§ 2.5 | 415 V · 3 phasep. 7 | 415 V · 3 phasep. 7 | 415 V · 3 phasep. 6 |
| Motor protection | IP55§ 2.5 | IP55p. 7 | IP55p. 7 | IP55p. 6 |
| Fan selection curve | Submit curve§ 3.1 | Includedp. 9 | Includedp. 8 | Not supplied— |
Engineer review required
Illustrative data · Not for construction

In developmentCreate engineering
Create engineering
drawings.
Turn your brief and standards into editable drawings and linked schedules for engineer review.
Starting with structural and electrical. CAD export and Revit workflows planned.
E-201Electrical room · Section A–A
Demo